Blowdown valve

Everything about blowdown valve for industry

Blowdown valve: the working principle in practice

A blowdown valve removes water from a boiler in order to control the concentration of dissolved solids and to clear sludge from the bottom of the drum. With blowdown valve the difference between a good and a mediocre solution often sits in details that do not show on a drawing. Anyone looking into blowdown valve quickly runs into a choice that goes beyond picking a catalogue number. On a boiler, blowdown valves control the salt content of the boiler water, with continuous blowdown for fine control and periodic blowdown for sludge at the bottom. Condensate carried along in a steam line causes erosion and water hammer, and both attack a valve faster than the steam itself. An emergency stop valve shuts off supply in a hazardous situation, and closing time there is a safety parameter rather than a comfort requirement. On blowdown valve we always check the full operating envelope, including start up and shutdown. With blowdown valve the seat is the component that determines performance, and the body is rarely the limiting factor. What weighs heaviest on blowdown valve in practice is the combination of temperature and differential pressure, not either one alone. A desuperheater injects water into the steam flow to bring temperature back to just above saturation, where atomisation quality determines the result. Steam is a demanding medium because pressure and temperature rise together and the medium can change phase within the same line. We find that questions about blowdown valve almost always come back to the same three points: medium, temperature and required tightness.
Schroeder Fluid loop test system

Material, seat and construction on blowdown valve

Without blowdown the salt concentration in the boiler water rises until foaming and carryover start damaging downstream equipment. In practice we find that most failures around blowdown valve come not from the material but from a wrong assumption during selection. The balance between required tightness and available operating force is a recurring tension on blowdown valve. The valve works under a severe pressure drop with flashing water, which is one of the harshest duties in a boiler house. A pressure reducing station brings steam pressure back to the level the consumers require and holds that pressure stable under varying demand. In superheated steam the temperature sits above saturation, and soft seats and ordinary packings are then no longer usable. A turbine bypass routes steam around the turbine during start up and on a trip, and that valve has to handle a large duty within seconds. Hardened trim and erosion resistant materials are the norm here, because ordinary trim disappears quickly. On commissioning we record set pressure, closing time and test results, so the plant can be shown to run within specification. Insulation around a steam valve should leave the actuator clear, because overheating of the actuator is a common cause of failure. With blowdown valve it pays to include phase changes in the medium, because those sharply increase the load on the seal. How blowdown valve behaves under varying load says more about the quality of the selection than behaviour under steady load.

Applications of blowdown valve in industry

Blowdown valves are found on steam boilers in power plants, industrial boiler houses and combined heat and power installations. Boiler houses, combined heat and power plants and district heating together form the largest application area for these valves. In power generation these valves sit on the critical paths around boiler and turbine, where downtime costs money immediately. In plants where blowdown valve is applied, the emphasis is on reliability rather than lowest purchase price. We see demand for blowdown valve rising in hydrogen and ammonia projects, where tightness requirements are high. For blowdown valve the sector determines which documentation and tests belong with the delivery. On project supply we record per position which execution of blowdown valve was delivered, including materials and tests. In process industry steam is used for heating, stripping and sterilisation, and each of those duties sets its own requirements. Our market is project driven and international, and we deliver worldwide to installers, EPC contractors and end users. During turnarounds blowdown valve is regularly on the critical path, and then predictability matters more than the lowest price. In an existing plant blowdown valve is often part of a wider question about availability and maintenance.
STRIKO Valves

What we look at when selecting blowdown valve

Where blowdown valve forms part of a safety function we record the fail position and required stroking time explicitly. For safety functions we record the required closing time and fail position explicitly in the order. At large pressure ratios we use multistage or perforated trim to keep noise and erosion within acceptable limits. On steam applications we always ask for pressure and temperature upstream and downstream, because pressure drop defines the trim construction. Where there is doubt about blowdown valve we quote two executions side by side, with the trade offs stated explicitly. On blowdown valve we also state what an execution cannot do, because that prevents more problems than a list of advantages. For blowdown valve we ask as standard for DN, pressure class, medium, temperature and required actuation. The cleaning and flushing procedure counts too on blowdown valve, because it can be more aggressive than the process itself. On steam we always advise a condensate drain upstream of the valve, because it is the cheapest life extension available. PRUSS is strongly represented in this segment with valves for steam, boiler, turbine and gas turbine duty. A P&ID, a datasheet or even a photograph of the existing installation often helps us faster than a long description. The right choice around blowdown valve starts with a full set of process data rather than with a request for a price.
TOSV butterfly valve

Your enquiry for blowdown valve at Dutch Valve Vision

Dutch Valve Vision stays available after delivery of blowdown valve for technical questions and for parts. What defines us is that we would rather spend an extra half hour on the specification than ship the wrong valve that comes back two months later. On blowdown valve we come back with a proposal that explains why we recommend a particular execution. Our specialists are happy to discuss blowdown valve on the basis of your P&ID, your datasheet or simply a photograph of the situation. We handle an enquiry for blowdown valve on its technical merits rather than as a price request that only produces a number. We quote a realistic lead time rather than an optimistic one, because a missed delivery date costs more than an extra week in the planning. For shutdowns and turnarounds we look at accelerated routes, and in those cases we are honest up front about what is and is not achievable. A tag plate with project data belongs with blowdown valve as standard where the project requires it. On blowdown valve we make sure the chosen execution demonstrably meets the stated standards rather than merely looking plausible on paper. Material certificates and test reports are supplied with blowdown valve, matched to what the project requires. We supply blowdown valve as a loose product or as a fully assembled unit with actuator and accessories. For repeat orders of blowdown valve we record the configuration, so a follow up delivery is identical to the first. You can reach us on +31 (0)70-2210560 and at sales@dutchvalvevision.com, and our office hours are Monday to Friday from 09:00 to 17:00.
Striko mengers en breekplaten

Frequently asked questions about blowdown valve

What exactly does blowdown valve mean?
On a boiler, blowdown valves control the salt content of the boiler water, with continuous blowdown for fine control and periodic blowdown for sludge at the bottom. A desuperheater injects water into the steam flow to bring temperature back to just above saturation, where atomisation quality determines the result. Steam is a demanding medium because pressure and temperature rise together and the medium can change phase within the same line. Condensate carried along in a steam line causes erosion and water hammer, and both attack a valve faster than the steam itself. That makes blowdown valve a subject where discussion up front pays for itself in operation. The answer to this question on blowdown valve changes as soon as the medium or the temperature changes. It pays to understand the working principle behind blowdown valve first, because the limits follow from that principle. Our customers work in chemicals, petrochemicals, pharmaceuticals, power generation, offshore and in hydrogen and ammonia projects.
Insulation around a steam valve should leave the actuator clear, because overheating of the actuator is a common cause of failure. On steam we always advise a condensate drain upstream of the valve, because it is the cheapest life extension available. An emergency stop valve shuts off supply in a hazardous situation, and closing time there is a safety parameter rather than a comfort requirement. A pressure reducing station brings steam pressure back to the level the consumers require and holds that pressure stable under varying demand. The answer on blowdown valve depends strongly on operating conditions, which is why we always ask for those first. This is one of the points on blowdown valve where suppliers differ most clearly from one another. That principle explains why blowdown valve behaves differently from a standard execution under heavier duty. We think along from the basic specification through to the tag plate, and supply documentation that a buyer or inspector accepts without discussion.
In superheated steam the temperature sits above saturation, and soft seats and ordinary packings are then no longer usable. Without blowdown the salt concentration in the boiler water rises until foaming and carryover start damaging downstream equipment. The valve works under a severe pressure drop with flashing water, which is one of the harshest duties in a boiler house. Hardened trim and erosion resistant materials are the norm here, because ordinary trim disappears quickly. Our experience with blowdown valve comes from projects in chemicals, power generation, technical gases and offshore. We see this come back regularly in enquiries about blowdown valve, and the answer is rarely a single sentence. We regularly see that a small change in the execution of blowdown valve makes a large difference to maintenance frequency. What defines us is that we would rather spend an extra half hour on the specification than ship the wrong valve that comes back two months later.
What should I watch technically on blowdown valve?
In process industry steam is used for heating, stripping and sterilisation, and each of those duties sets its own requirements. Boiler houses, combined heat and power plants and district heating together form the largest application area for these valves. Blowdown valves are found on steam boilers in power plants, industrial boiler houses and combined heat and power installations. In power generation these valves sit on the critical paths around boiler and turbine, where downtime costs money immediately. For blowdown valve a good specification up front is cheaper than a correction afterwards. If you are unsure about this on blowdown valve, we are glad to put the question alongside the actual process data. The application range of blowdown valve runs from simple utility duty to heavy process plant, with a corresponding difference in execution. We work as a technical supplier rather than a catalogue reseller, which means we carry out the selection ourselves on the basis of medium, pressure, temperature and code requirements.
If you have an existing tag plate or serial number, send it along, because that lets us work directly from the original configuration. Please also state the connection standard, the required leakage class and any project requirements such as NACE, PED or ATEX. Lead times depend on the execution, because a standard size from a running series behaves very differently from a valve in an exotic alloy with NACE certification. A P&ID, a datasheet or even a photograph of the existing installation often helps us faster than a long description. On blowdown valve we include start up and shutdown, because that is where the heaviest loading occurs. On blowdown valve we prefer a well founded answer to a fast one that turns out to be wrong later. Even when the specification for blowdown valve is not yet finalised, you can bring the question to us. We are based at Vlotlaan 641, 2681 TZ Monster in the Netherlands and can be reached on +31 (0)70-2210560 and at sales@dutchvalvevision.com.
For shutdowns and turnarounds we look at accelerated routes, and in those cases we are honest up front about what is and is not achievable. On repeat orders we record the configuration, so a follow up delivery is identical to the first and installation holds no surprises. On commissioning we record set pressure, closing time and test results, so the plant can be shown to run within specification. We keep spare parts and overhaul kits mapped per project, so that a breakdown does not start with a search from scratch. That makes blowdown valve a subject where discussion up front pays for itself in operation. This is one of the points on blowdown valve where suppliers differ most clearly from one another. Tests around blowdown valve are carried out by us or on our instruction according to the requirements in the specification. Dutch Valve Vision operates under a KIWA ISO 9001 certified quality system, which in the RFQ stage of chemical and offshore projects is usually a hard requirement.
We quote a realistic lead time rather than an optimistic one, because a missed delivery date costs more than an extra week in the planning. Documentation such as material certificates, test reports and declarations is supplied as standard, matched to what the project requires. For an accurate quotation we need the nominal diameter, the pressure class, the medium, the operating temperature and the required actuation. We come back with a proposal that explains why we recommend a particular execution, including the alternatives we considered. The answer on blowdown valve depends strongly on operating conditions, which is why we always ask for those first. We see this come back regularly in enquiries about blowdown valve, and the answer is rarely a single sentence. We think along on the spare parts strategy for blowdown valve, so critical positions stay covered. Call +31 (0)70-2210560 or send your specification to sales@dutchvalvevision.com and we will pick it up.